Design – Build
Marseille Provence Airport P3a/P3b/P4
– Marignane (13)
G+3 car park
Exécution à venir
ABAWORKSHOP Architect
5570
spaces
77350
m²
26200
K€
Increase in the capacity of 2 car parks
at Marseille-Provence Airport
With installation of photovoltaic shading structures on the last levels.